I have been mostly off-line since I posted to this blog last Wednesday. On Thursday, after an off-site meeting in mid-afternoon, I rushed to a rental place to see if they had a pressure washer. I'd already called and learned they didn't have one for the weekend, which was my preferred time to do it. I hadn't asked about one for that evening, since I didn't think I could get to their place before their 5:00 PM closing time.
My meeting ended a little early, so I rushed to the shop and arrived at 4:58 PM. Yes, they did have a pressure washer, but it was scheduled to go out at 7:30 AM the next morning. I decided to take it. It turned out to be one of the big ones, requiring two men to lift it into my truck bed. Traffic was awful, and I didn't get home till 5:55 PM, leaving me an hour of daylight, plus a half-hour of dim twilight, to get the thing unloaded, figure out how to use it, move hoses, hook it all up, and wash the stupid deck.
Somehow I got it all done, despite pulling the hose off the quick coupling and separating the 0-ring from the hose. I got the o-ring back on, miraculously, and finished the deck new the end of twilight. I then dropped the wand over the deck, went below and washed the lower decks—in the dark, with only the lights from The Dungeon windows letting me see what I was doing. I was pretty sure daylight would show this late washing marginally effective.
But washing a deck on Thursday means painting/staining it soon thereafter. On the way home Friday I stopped at Lowes and bought semi-opaque stain and a roller. Got home at mid-twilight. Saturday was the big day. I pounded down loose nails, scraped a couple of areas, and, while the workers were working on the insurance-funded repairs in The Dungeon, I stained the deck. At least, I did the bulk of the flooring. Since this was two or three years overdue, and since rain was forecast for Monday (today), I decided to leave the trim for later and get the lion's share of the flooring done. It needed it badly.
Last time I stained the deck, probably four years ago, I used a 3-inch brush. Took two days and about killed my back and knees. This time I decided to roll it, using the long-handled roller Lynda bought. I'd never have spent that kind of money on a tool, but this one is a good one. It even had an extension on it. I barely had to bend, although standing erect and rolling I felt that I didn't have enough control over the roller. Took two hours, and left me tired enough. The trim and rails were left for another day.
It would have been nice for that to have been the only maintenance needed on the property that day. Alas, clean-up and dishes (I'm batching it again, for two or three weeks) and clearing deadfall also needed attention. Then there was the neighborhood block party Saturday evening to cook for and attend. By Saturday evening I was in no shape for anything, except watching a little college football and reading less than my weekend day quota in Children of Dune.
Sunday was better. Good rest. Good worship. Good Bible study. Good lunch fellowship with a good friend who was also a temporary bachelor. Good afternoon reading. No access to computer until about 7 PM, however, as the workers were still at it in The Dungeon. I finally got in there about 8 PM, but the fumes were so strong I didn't want to stay there and breathe in all those solvents and all that dust. Back upstairs, where I divided my time between pro football and catching up on Children of Dune.
So it was a weekend of little writing accomplishment. I researched my next Bible study, read some in Poets and Writers, read in CoD, which is sort of research for sci fi writing, and filed some writing business type stuff. Would have liked to do more, but that was all. Hopefully this week will be more profitable.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment